In the Frozen North

After the complexities of our journey north we then faced a week of bad weather. The forecasts were highly accurate. Howling winds kept us in the safe harbor. We kept warm during the day with a small electric heater, just 750 watts, with the addition of the diesel heater that pumps hot water through radiators. The boat is well insulated, which helps a lot. The windows are not double pane so they have to be wiped dry a few times a day as they fog up. As we absorbed the moisture off the panes we gazed out at snow flakes, hail, sleet and the occasional blue sky.

View from Viking
View from our window in April, 2121
first boat pizza
First pizza of the year

We took the time to deal with any issues that arose over the winter. People were skating on the canals this year, for the first time since 2012 or so. This used to happen every year but the climate has been warming so skates spend long lonely years in the closet. We expected issues and found a few. The shower faucet froze despite having been drained by normal means. I should have removed it completely, apparently. The shower pump failed. A window leak worsened. It needs to be removed and re-bedded. Not bad overall.

IMG_20210412_114325

We arrived on the 4th and left on the 13th for our annual haul out. You need to check the anodes that protect the boat from electrolysis. Sometimes there is stray current in the water. This current causes weaker metals to migrate to stronger metals. Unchecked you can ruin a prop, rudder and other parts. You can install a galvanic isolater, which we will do. It prevents DC voltage from doing its worst. DC can cause problems when the boat is connected to shore power.

Monday the 12th April broke at O centigrade but sunny. We have outside steering only but stay warm and dry under the rainhood. There was some wind, a bit of hale and a snow shower or two, so staying dry and out of the wind helps greatly.

Along the way I monitored a leak at the prop shaft. There is a grease fitting around that shaft that has probably never been renewed. Before we left I made arrangements for it to be repaired at the haul out.

We made it to the tiny town of Zwartesluice in the large lovely marina. The next morning we being a few days living on the hard, as we say. The boat is put on a frame, they bring a set of stairs so we can easily get aboard, and we plug into electricity. The only disadvantage is the walk to the toilets, as we can not use the one we have aboard. The morning temperatures are still around freezing.

The next morning we make progress on the repairs. In spare moments we made an appoint for temporary residence, required if EU citizens plan to be in the country for more than three months. With the number they give you you can get the covid vaccine. We made the appointment for the number. They are vaccinating the people in our age group now. I’ll report on that as matters develop.

Comment here (login optional)

This site uses Akismet to reduce spam. Learn how your comment data is processed.